Golders Green 1930s Semi, North London renovation completed by Alstruct Ltd
Extensions & Full Renovation

Golders Green 1930s Semi: Extensions & Renovation, North London

A large 1930s semi-detached in Golders Green, NW11: rear extension, two-storey side extension, new kitchen and bathrooms, full M&E replacement and professional redecoration throughout.

Location
Golders Green, North London
Service
Extensions & Renovation
Investment
£320,000+
Completed
2024

Project Overview

This substantial 30-week renovation in Golders Green is one of our most comprehensive residential projects in North London. The property, a large 1930s semi-detached house on one of Golders Green's most desirable residential roads, came to us ready for a thorough transformation. The owners had a clear ambition: to bring every aspect of the house up to the standard expected of a premium Barnet Borough family home, without compromising the generous proportions and period character that make these interwar properties so sought-after.

Executed under a JCT Minor Works Contract with a full professional team including architect, structural engineer and CDM health and safety coordinator, the project touched every element of the property. The result is a home that looks, feels and functions as a thoroughly modern family house while remaining faithful to its 1930s bones, with the added benefit of a rear extension and two-storey side extension that significantly increase the available living space.

The Challenge

The house sits on a classic Golders Green street of substantial interwar semis: large, well-proportioned houses with generous room heights, bay windows and the kind of solid build quality that has kept them standing for nearly a century. This property was carrying decades of incremental updates: outdated M&E services throughout, a kitchen that did not make use of the generous space available, bathrooms ready for complete replacement, and a structure that, while fundamentally sound, required careful engineering assessment and party wall agreements with the neighbouring property before any extension or structural works could proceed.

Working in close coordination with the appointed structural engineer, CDM coordinator and party wall surveyors, our team developed a fully integrated programme that delivered all works within a single 30-week contract, giving the owners one clear plan, one budget and one team from start to finish.

Our Approach

The key to a project of this scale is programme management. With party wall awards, structural engineering sign-off, specialist trades and a family in temporary accommodation, a clear, well-sequenced programme matters. Our approach was to front-load all the heavy structural and M&E work in the first eight weeks (strip-out, structural steel installation, party wall works, new drainage, new electrical first fix and new plumbing first fix) before moving on to the more controlled environment of plastering, joinery, tiling, kitchen installation and decoration in the second phase.

Every subcontractor on the project was procured and managed directly by Alstruct, working within a single contract with the client. This single point of responsibility kept every trade coordinated under one programme and applied a consistent quality standard across every element of the work, from groundworks to the final coat of paint.

Scope of Works

  • Structural engineering works throughout: removal of load-bearing walls, installation of steel beams and structural openings, all to structural engineer's specification
  • Party wall agreements agreed with the adjoining neighbour, with all notifiable works carried out in accordance with the party wall awards
  • New rear extension: new foundations, structural frame, external envelope, roof and internal finishes
  • Two-storey side extension, extending the living space across ground and first floor levels
  • Full strip-out of existing finishes, services and fittings throughout the property
  • Complete replacement of all electrical services: new consumer unit, full rewire, new lighting design and socket layout throughout
  • Complete replacement of all plumbing and heating services: new boiler, new radiators, new pipework and new hot and cold water distribution throughout
  • New drainage where required, above and below ground
  • Full replastering throughout all rooms on all floors
  • New kitchen: bespoke cabinetry, worktops, appliances and kitchen drainage
  • New bathrooms throughout: all suites replaced, new tiling, new sanitaryware and new shower enclosures
  • New internal doors, door furniture and all joinery throughout
  • New flooring throughout: hard flooring on ground floor, carpeting on upper floors
  • Full professional redecoration throughout all floors to designer specification
  • External works and landscaping: new front path and driveway, rear garden landscaping, external decoration
  • CDM health and safety coordination throughout the project

The Result

The completed renovation at Golders Green 1930s Semi is a complete reinvention of a house with real potential. The rear extension and two-storey side extension deliver the generous open kitchen-diner that a property of this size deserves. The new M&E services are built for decades of reliable use. And the quality of finish, consistent from the ground floor reception rooms to the top-floor bedrooms, reflects the high standard that Golders Green homeowners rightly expect.

Delivered on time and on budget within the JCT contract, this project is a demonstration of what structured professional management can achieve when a skilled contractor, an experienced design team and a decisive client work together towards a shared goal.

"Alstruct managed the entire renovation from start to finish: the structural works, the party wall process, every trade, the kitchen, the bathrooms, all of it. The programme management was excellent and they delivered exactly on schedule. The quality of the finish is superb and the whole experience was far less stressful than we feared. We would use them again without hesitation."

Property owner

Golders Green, North London

Inspired by This Project?